Project: Al Satwa Residential Building

BURJ KHALIFA DISTRICT

Al Satwa Residential Building — Dubai

Located in the vibrant district of Al Satwa, this residential building comprises basement, ground floor, two podium levels, eight residential floors, and a roof level.

The project demanded materials that could accommodate both structural complexity and residential functionality, while maintaining a refined aesthetic across common and private spaces.

Surface solutions were required for high-traffic zones, vertical circulation areas, and residential interiors, ensuring long-term performance and visual coherence throughout the building.

Project Development

The development process focused on aligning design intent with technical execution from the outset.

Close coordination with the consultant and contractor teams enabled:

Each specification was finalized prior to production, allowing materials to integrate seamlessly with the project’s structural and architectural framework.

Operational Execution & Delivery

Production and supply were managed through a structured workflow designed to support phased construction activities.

Materials were:

Delivery was organized to facilitate efficient handling on-site, minimizing disruption while supporting installation across different building zones.

This approach contributed to steady construction progress and reduced coordination challenges during execution.

Project Team

Client / Owner

Mr. Ahmad Abdullah Husain Lootah

Consultant

Al Hilal Engineering Consultants

Main Contractor

Bait Al Yazi

Project Scope

Porcelain tile supply and marble works

Project Outcome

The Al Satwa residential building reflects the importance of early-stage coordination and disciplined execution in multi-level developments.

Through careful planning, controlled production, and aligned delivery scheduling, the project achieved:

Delivery was organized to facilitate efficient handling on-site, minimizing disruption while supporting installation across different building zones.

This approach contributed to steady construction progress and reduced coordination challenges during execution.